Turn the private delivery of dozens of servers and twenty-odd middleware components into a web wizard: pre-checks, parallel installation in dependency order and automatic cluster integration checks; monitoring, diagnosis, upgrades and inspections continue in the same platform after delivery.
The challenge
- Every project installs big data, database, messaging, gateway and monitoring components by hand, scripts and documents differ from person to person, and new engineers struggle to deliver on their own.
- Sites vary widely in CPU architecture, operating system and offline networks, and only senior engineers can troubleshoot.
- After delivery the customer's operations team cannot take over, so upgrades, scaling and inspections mean going back on site.
The solution
Use WPECS: a single static binary, with no agent on the target hosts.
- Guided deployment: choose applications, add hosts, automatic layout, parameters, pre-checks, plan and run; every component has built-in integration checks, failed steps are classified with suggested fixes, and you can retry only what failed.
- High availability and tuning by default: Keepalived VIP, MySQL dual primary, Redis Sentinel and more are planned automatically, and key parameters are calculated from each machine's CPU, memory and disk type.
- Delivery becomes operations: host and process monitoring, 43 layered diagnosis rules, and alerts diagnosed automatically before going to Feishu, DingTalk or WeCom; rolling upgrades roll back on failure, with scheduled inspections and backups.
- Offline delivery: packages are exported per CPU architecture and imported on the private network with one command; delivery reports and maintenance manuals export directly.
Rollout
- Before going on site, prepare offline packages for the customer's CPU architecture and operating system.
- On site, enter host IPs and credentials in the wizard, choose the plan, confirm and run; fix failed steps as suggested and retry only those.
- After delivery, set notification channels, inspection and backup schedules, and export the delivery report for the customer.
Customer story (example)
Customer: the delivery team of a software integrator in eastern China, four engineers handling a dozen private deployments a year for government and enterprise customers.
The problem: each project had twenty to thirty servers and a dozen middleware components; scripts and documents meant a new engineer needed two projects before delivering alone, troubleshooting on site often ran late into the night, and every later upgrade meant another trip.
What they did: common plans became deployment templates; offline packages for the right architecture were prepared before each visit, IPs were entered in the wizard and the plan confirmed before parallel installation; failed integration checks were fixed as suggested and only those steps retried; monitoring alerts were connected to the customer's WeCom group at handover.
- Delivery became a standard process, and new engineers complete most deployments by following the wizard.
- The customer's operations team watches monitoring and receives alerts in the same platform, so routine upgrades and inspections no longer need a site visit.
- Every project leaves a delivery report and maintenance manual, so experience carries over between projects.
Example: the customer and details are compiled from typical customer needs to show how the product is used, and do not describe a real customer.